Reports

Throughout the study, various reports will be prepared including Public Information Centre Summary Reports and a Transportation Environmental Study Report which will document the Recommended Plan as well as environmental protection and mitigation measures. These reports will be posted here as they become available.

PIC #1 was a joint session with the HWY 62 Norris Whitney Bridge Rehabilitation / Replacement project and was held on December 14, 2017. The Summary Report can be found below:

  • Replacement of Structures and Widening of Highway 401 in Belleville ON Summary Report